Earth Sciences Observatory

15156_eost_strasbourg_exterieur_02.jpg
Ingénierie d’exécution interne Ingénierie d'éxécution Équipement Enseignement Industrie et laboratoire Laboratoire

For this simple volume extension, the GBE process allowed for the casting of walls and their integrated insulation in a single operation on-site. This streamlined the construction process. Another notable feature was the connection of the extension to the existing building, particularly the technical areas of the laboratories and cleanrooms.

15156_eost_strasbourg_exterieur_03.jpg
15156_eost_strasbourg_exterieur_05.jpg
15156_eost_strasbourg_exterieur_01.jpg
15156_eost_strasbourg_exterieur_04.jpg

In detail

The remains of a Vauban wall were discovered during the excavation work prior to the start of the construction project.

  • Project Owner
    Université de Strasbourg
  • Location
    4 Rue Blaise Pascal, 67000 Strasbourg, France
  • Construction cost
    €8.5MHT
  • Certification
    Laboratoires L2
  • Built floor area
    4,415 m²
  • Renovated floor area
    5,800 m²
  • Services
    BASE + EXE

Related projects

See all projects
Lyon

25, Rue Saint Jérôme
69007 Lyon • France
+33 (0)4 78 28 51 30

See on maps
Alpes

6, allée des Joncs
73420 Drumettaz-Clarafond • France
+33 (0)4 79 34 36 25

See on maps
Bahrein

Sanabis - Euro Tower
7th FloorRoad 1010 Block 410 – Manama • Kingdom of Bahrain
+973 172 50 822

See on maps
Paris

39 rue des Vignoles
75020 Paris • France
+33 (0)1 53 17 91 00

See on maps